Ulitsojeus Get the Library

The archive

Twelve notes sit in the live index. A note is added only after the Four-Pass Method has a table or a checklist and a written failure condition. The selection rule is use, not novelty: if a method has not been run on three live cases, it stays in draft.

Notes are edited after publish when a field name changes or a collapse condition appears. The edit is dated in the body. There is no silent rewrite that makes an old note look as if it had always been right. Retired methods are listed below the grid so the archive also records what was pulled.

All notes

Use the chips to keep one category. Without JavaScript the chips are hidden and every tile stays in view. The first two titles open as full notes; the rest expand here as summaries until they are written up at the same length.

Quiet booth seating in an office

Decision systems

The decision log that survives a reorg

Most decision logs die in the first reorg because they store names, Slack threads and slide titles instead of the call itself. This note lays out a six-field log that still works when the team is split, renamed or absorbed. The rule is simple: a stranger from a neighbouring team should be able to reconstruct the decision from the row without asking who sat in the room.

14 Jan 2026 · 9 min

Three people reviewing papers at a table

Measurement

A metric tree you can actually defend

A metric tree is only as good as the argument you can make with it in a review. This note describes a tree with one outcome, three input metrics and two guardrails, plus a diagnostic layer that never appears on the weekly slide. The test is whether someone who disagrees with you can still use the same tree to argue the other way.

28 Jan 2026 · 12 min

Open desks and a closed laptop

Writing & docs

Writing the one-page spec before the deck

Decks invent product. A one-page spec written before any slide forces the claim, the non-goals and the first test into a format that cannot hide behind a transition. This note includes the page layout used here, the order of sections, and the two checks that stop the spec from turning into a press release. If the page cannot be read aloud in six minutes, it is not finished.

6 Feb 2026 · 7 min

Glass facade of an office building

Review rituals

Weekly review in four columns

Status meetings swell because they try to be a narrative. This review uses four columns and a hard stop: what shipped, what is blocked, what was decided, and what was deliberately dropped. The last column is the one teams skip, and it is the one that keeps the board honest. The note includes the prompt for each column and the rule for carrying a row into the next week.

19 Feb 2026 · 6 min

Tooling

Tool audit: what I removed and why

Tool sprawl is usually defended with sunk cost and a screenshot of a dashboard nobody opens. This audit used a single test for every tool: which decision or measurement depends on it weekly. Three tools failed that test in March 2026. The note records what was removed, what replaced the habit, and the two-week watch for regressions. Nothing here is a stack recommendation; it is a method for taking things out.

3 Mar 2026 · 8 min

Decision systems

Scoring intake requests without a committee

Intake committees form when nobody wants to say no in writing. This note publishes a five-factor score that anyone can apply to a request before it reaches a triage slot. The score is visible, the weights are fixed for a quarter, and appeals go to a single owner role. The failure mode is gaming the rubric; the counter is a quarterly weight review, not a secret override.

17 Mar 2026 · 10 min

Measurement

Counting the things that resist counting

Some work resists a clean count: quality of a spec, health of a handoff, load on a reviewer. This note describes three substitutes that still behave like measurements — sampled reviews, cycle-time bands and explicit non-counts — and the language to use when a number would lie. If a metric cannot survive the question “what would we stop doing if this moved”, it does not go on the tree.

2 Apr 2026 · 11 min

Writing & docs

Templates rot, checklists age slowly

A template starts as a kindness and ends as a form people paste into. This note separates templates (shape of a document) from checklists (exit tests) and explains why the second ages more slowly. Versioning rules, a retirement date on every template, and a short list of phrases that signal rot. The accompanying checklist is in the Library; the argument is free.

15 Apr 2026 · 5 min

Review rituals

A retro format that stops the blame loop

Retros turn into blame when the prompt is “what went wrong” and the room is tired. This format asks for the system that produced the result, the prompt that would have changed the path, and one experiment with an owner role and a stop date. Names of people are not written on the board. The note includes the timing, the parking-lot rule, and the two phrases that get the room back on the system.

29 Apr 2026 · 8 min

Tooling

Note-taking as a build pipeline

Notes stall when capture and publish live in the same document. This pipeline treats a working note like a build: raw log, framed problem, tested table, then publish or retire. Each stage has an exit test and a place to stop. The tooling is deliberately dull — a dated file, a table, a retired list. The point is to stop rewriting the same incident in a nicer tone.

12 May 2026 · 9 min

Decision systems

The two-week horizon rule

Teams lock long-range decisions in the same meeting that clears a two-week block. The horizon rule splits those calls: anything whose effect sits past fourteen days needs a revisit date or it stays a hypothesis. This note shows how the rule sits on the decision log, how exceptions are recorded, and why “we will know more later” is an acceptable state if it is written down.

26 May 2026 · 7 min

Measurement

What a dashboard should refuse to show

Dashboards fail by addition. This note is a refusal list: vanity totals, unowned charts, metrics without a decision, and anything refreshed more often than it is used. In their place: the metric tree, a last-updated stamp, and a link to the definition. If a chart cannot name the decision it serves, it does not ship. The accompanying teardown format is in the Library.

9 Jun 2026 · 10 min

Retired methods

These were used, then pulled. They stay listed so the same shape is not rebuilt under a nicer name.

Method When it was used Why it was pulled
OKR cascade sheet January 2026 Teams optimized the sheet instead of the work. Scores moved while behaviour did not.
RAG status traffic lights January–February 2026 The colours hid disagreement. Amber became the default and blocked nothing.
Five-whys form February 2026 The form turned into a blame script. The last “why” always landed on a person.

What gets written up

Four tests. A draft that fails one of them is not scheduled for a Monday.

Lived once is not enough

The method has to have been used on three separate cases, not three retellings of the same incident. If the third case needs a different table, the method is not ready and the table is rewritten before any prose.

A stranger can lift it

A reader who was not in the room should be able to fill the table from the note. If the note depends on private context, slang or a vendor nickname, it goes back to Frame. The artefact is the product, not the anecdote.

Failure is named

Every note lists where the method breaks. Collapse conditions are written as situations you can recognize, not as character flaws. If the failure section is a shrug, the note is still a draft.

No client theatre

This archive does not publish named clients, conversion rates or testimonials. Those numbers belong to other people and they decay the moment they are used as proof. The work has to stand on the table.

Reading order

If you are new to the notebook, these four notes in this sequence give the load-bearing pieces. The rest can be read in any order.

  1. The decision log that survives a reorg — start here if decisions evaporate after a reshuffle. The six fields are reused by later notes.
  2. A metric tree you can actually defend — the counterpart on measurement. Read it before any dashboard note so the refusal list has somewhere to sit.
  3. Writing the one-page spec before the deck — the document habit that stops slides from inventing the work. Use it when a review is about to become a performance.
  4. Weekly review in four columns — the lightest ritual. It is the place the log and the tree get looked at without a new meeting type.

Templates sit in the Library

The public notes argue for a structure. The blank tables, the extended versions and the monthly teardown PDFs are paid files. If you only need the argument, stay on this page. If you need the file you can hand to a team, open the Library.

See Library plans